Friday, November 11, 2005

Drip! Drip!

Day one of waterproofing started late and ended early, and it became really obvious that this job was going to take a lot longer than I realized. Day two started even later, and ended even earlier, and it became obvious that I needed to say something. Day three started early, and ended late...which made up for lost time. AND...the job is finished. It looks great, and I hope that it works great, too. Bring on the rain!

In the process of the job, the crew poked a hole in a drain pipe that led to the sewer. Fortunately, a plumber was working on my in-laws' house, and he came over to look at and repair the drain pipe for what seemed like a reasonable price to me. Hopefully, the waterproofing company will honor their word about covering the cost. They should. They made over 6g, and the pipe repair was just over 100 dollars. I'll be ticked if they don't.

I'm very tired. It's bed time. More sometime soon.

1 comment:

Anonymous said...

Looks nice! Awesome content. Good job guys.
»